N-architect
Copyright N-architect

N-architect

  • HOME
  • CONTACT
  • PROFILE
  • PROJECTS
Copyright N-architect

N-architect

AROBASE 2 OFFICE

Castres, France
Office
5 000m2
2007

 

Located in Castres (south of France), this project is a mixed development of office and workshop/warehouses. In order to minimize the footprint in a natural environment, the proposition was to superimpose the office space over the workshop. This choice gives the opportunity for a single tenant to rent both office and warehouse space for his activity. The gain of ground floor area allows a better traffic management (cars + trucks). Despite the opaque enclosed aspect of the workshop level, the office floor is widely glazed and open to the surrounding landscape. Wooden sun shading devices emphasize this office area and protect it from summer overheating.

 


 

Situé a Castres (31), proche de Toulouse, ce projet consiste en un développement mixte de bureaux et d’ateliers/entrepôts, regroupés afin de créer une pépinière d’entreprise. Afin de minimiser l’empreinte au sol du projet au cœur d’un site naturel, le parti prit retenu a été de superposer les bureaux au-dessus des ateliers. Ce choix permet en outre a une entreprise d’occuper des locaux mixte atelier+bureaux. L’espace au sol ainsi récupéré permet une gestion plus aisée des flux motorisés (voitures, camions de livraison). En opposition à l’aspect ferme et solide des ateliers, l’espace des bureaux est lui largement ouvert, comme en belvédère sur l’espace naturel environnant. Des brises soleils en bois viennent souligner cet espace de bureaux, tout en le protégeant des surchauffes d’été.

Related Posts

VIVATEL

VIVATEL

Kuala Lumpur, Malaysia Hospitality 7 000m2 2010   Sitting on top of the freshly completed huge shopping mall refurbishment, VIVATEL tends to classify itself as being halfway between a business and a boutique hotel. Located in the outer suburbs of KL, in a very active and evolving area, the hotel needed to be iconic. The […]

MPL APPARTMENTS

MPL APPARTMENTS

Kuala Lumpur, Malaysia Housing 20 000m2 2008   Sitting on top of an existing office and commercial 6-storey building, MPL apartments’ project had one main constraint: the existing podium can’t support the load of the MPL project. To make this project possible, a huge structure crossing over the existing building has been designed to support […]

LIC CINEMA

LIC CINEMA

New-York City, USA Facility 50 000m2 2011   Cinemas over the world are usually enclosed big format boxes, trying to get the visitor cut off from its reality and surroundings, to immerge him into the imaginary sphere of the theatre. Long Island City Cinema is different from the average cinema complex. Located on the East […]

ZERO WASTE CENTER

ZERO WASTE CENTER

St Denis, France Industrial 5 000m2 2007   Since the last few years, the relationship between society and waste that it produces has dramatically evolved. From a linear way of thinking (product to waste), we are now moving to a cycling vision (product A to waste A to product B …). If this relationship changes, […]

LEAVE A COMMENT CANCEL REPLY