N-architect
Copyright N-architect

N-architect

  • HOME
  • CONTACT
  • PROFILE
  • PROJECTS
Copyright N-architect

N-architect

ECM OFFICE

Kuala Lumpur, Malaysia
Office
3 000m2
2009

 

Located in Kuala Lumpur emerging middle-high class suburbs, ECM office is the HQ of an international banking company. The existing building needed a refurbishment, as it was covered with marble tiles … Keeping the existing façade structure, the idea of this project was to wrap-up the building with a combination of clear glass, tinted glass and aluminum composite panels, randomly positioned all around the building. To prevent overheating, the south-west façade has been over provided with aluminum composite panels. This second skin follows and reveals the interesting “peanut” shape of the building, with the addition of a pixilated pattern.

 


 

Situé dans un quartier chic en reconversion de la banlieue de Kuala Lumpur, l’immeuble de bureaux ECM est le siège d’une banque internationale. Le bâtiment existant était désuet, recouvert d’un plaquage en marbre d’une autre époque … Tout en conservant la structure de la façade existante, l’idée du projet a été d’envelopper l’édifice avec une nouvelle peau, combinant verre transparent, verre teinté et panneaux d’aluminium, disposés aléatoirement. Afin de lutter contre les surchauffes internes, la façade sud-ouest a été toutefois particulièrement protégée par une quantité de panneaux d’aluminium bien supérieure à la moyenne du reste des façades. Cette seconde peau révèle ainsi la forme intéressante du bâtiment existant en y ajoutant un graphisme pixélisé contemporain.

Related Posts

LYP MALL

LYP MALL

Kuala Lumpur, Malaysia Commercial 5 000m2 2008   Located in the heart of Kuala Lumpur, LYP is the existing iconic IT mall of the city. The aim of the project was to refurbish the building as well as giving it a fresh and appealing look and identity. Using glazing and lighting effects, the new façade […]

VEOLIA CENTER

VEOLIA CENTER

Toulouse, France Industrial 800m2 2007   Located at the edge of Toulouse-Blagnac Airport, this water treatment unit feeds two needs. On one hand, it collects and delays the overall airport rain water. On the other hand, it treats this same water to clean it from any hydrocarbon before let it go to a natural channel […]

ZERO WASTE CENTER

ZERO WASTE CENTER

St Denis, France Industrial 5 000m2 2007   Since the last few years, the relationship between society and waste that it produces has dramatically evolved. From a linear way of thinking (product to waste), we are now moving to a cycling vision (product A to waste A to product B …). If this relationship changes, […]

SIA WAREHOUSE

SIA WAREHOUSE

Manila, Philippines Industrial 5 000m2 2013   Singapore Airlines needed a new warehouse to store their aircraft’s sparepart near Manila. This project responds to this industrial program by a simple, but yet elegant, folding skin, wrapping up the building, from floor to roof. This affordable solution gives a fresh and contemporay visual impact, away from […]

LEAVE A COMMENT CANCEL REPLY