N-architect
Copyright N-architect

N-architect

  • HOME
  • CONTACT
  • PROFILE
  • PROJECTS
Copyright N-architect

N-architect

MLC 2

Kuala Lumpur, Malaysia
Commerical
20 000m2
2012

 

Located in front of the Melawati hills landscape, this shopping centre aims to bring life into an aging shoplot area. MLC 2 requilifies the aborted MLC robotoc concept, as a rocky and hilly concept to match with the surrounding landscape.

 


 

Situe au premier plan du paysage de Melawati Hills, près de Kuala Lumpur, ce centre commercial a pour but de redynamiser un quartier commerçant vieillissant. MLC 2 prend la suite du projet abandonné MLC, en apportant un concept nouveau, base sur l’idée d’une façade rocailleuse et montagneuse en écho au paysage environnant

Related Posts

WATER PROJECT 2

WATER PROJECT 2

Paris, France Facility 80m2 2005   Extending the “water project 1”, this second proposal try to focus on the usage of water in an urban context and integrate the cycle of life that it generates. Therefore, the activity of the building itself changes to become public toilets. The shape of the building, to emphasis this […]

ZERO WASTE CENTER

ZERO WASTE CENTER

St Denis, France Industrial 5 000m2 2007   Since the last few years, the relationship between society and waste that it produces has dramatically evolved. From a linear way of thinking (product to waste), we are now moving to a cycling vision (product A to waste A to product B …). If this relationship changes, […]

QW OFFICE

QW OFFICE

Kuala Lumpur, Malaysia Office 4 000m2 2009   Previously held by Nestle HQ, this 30 years old building needed a fresh new start. Appointed as “façade designer” my work on this project was to give totally new look to the building with a very limited budget … My idea has been the preserve most the […]

POSITIVE ENERGY HOUSING

POSITIVE ENERGY HOUSING

Boulogne, France Housing 12 000m2 2006   The purpose of this project was to achieve a positive energy building, which means a building that produce more energy than it actually needs. The production is not really an issue because it relies on the area you can allow for the energy producing devices such as solar […]

LEAVE A COMMENT CANCEL REPLY