N-architect
Copyright N-architect

N-architect

  • HOME
  • CONTACT
  • PROFILE
  • PROJECTS
Copyright N-architect

N-architect

MLC 2

Kuala Lumpur, Malaysia
Commerical
20 000m2
2012

 

Located in front of the Melawati hills landscape, this shopping centre aims to bring life into an aging shoplot area. MLC 2 requilifies the aborted MLC robotoc concept, as a rocky and hilly concept to match with the surrounding landscape.

 


 

Situe au premier plan du paysage de Melawati Hills, près de Kuala Lumpur, ce centre commercial a pour but de redynamiser un quartier commerçant vieillissant. MLC 2 prend la suite du projet abandonné MLC, en apportant un concept nouveau, base sur l’idée d’une façade rocailleuse et montagneuse en écho au paysage environnant

Related Posts

SIA WAREHOUSE

SIA WAREHOUSE

Manila, Philippines Industrial 5 000m2 2013   Singapore Airlines needed a new warehouse to store their aircraft’s sparepart near Manila. This project responds to this industrial program by a simple, but yet elegant, folding skin, wrapping up the building, from floor to roof. This affordable solution gives a fresh and contemporay visual impact, away from […]

WATER PROJECT 1

WATER PROJECT 1

Paris, France Facility 80m2 2005   Based on an essential life element, this public bath project attempt to explore the various relationship the visitor can have with water and how to connect him to this element through his senses. The three level that composed the project attempt to give distinct aspects of these emotions. The […]

SAN FRANSISCO FIRE DEPT. HQ

SAN FRANSISCO FIRE DEPT. HQ

San Fransisco, USA Facility 5 000m2 2013   This project was designed for an International ideas competition, which goal was to design an HQ for the Fire Department of San Fransisco. The proposal was following three main concept ideas: PUBLIC SPACE Ground level is given back to the pedestrians and bicycles. a musuem of the […]

VEOLIA CENTER

VEOLIA CENTER

Toulouse, France Industrial 800m2 2007   Located at the edge of Toulouse-Blagnac Airport, this water treatment unit feeds two needs. On one hand, it collects and delays the overall airport rain water. On the other hand, it treats this same water to clean it from any hydrocarbon before let it go to a natural channel […]

LEAVE A COMMENT CANCEL REPLY